
By last Thursday, the bridge on Angola Rd. was fixed. Now Washington St. (the entire length) is torn up for a scheduled CBPU water main upgrade project. This is going to take a while due to the scale of the project, but hopefully not too long. If you need to use Washington as a through street try Pearl instead.