If you ever wondered what was under the sidewalk at the Coldwater Executive Suites, now you know (see picture). Not sure what they're doing that required all of this concrete to be cut out, but we'll observe and see. By the way, my wife was having lunch downtown last Thursday when the lanes were reduced on Chicago St. and witnessed two accidents. Traffic was backed up for several blocks. Please, be careful and SLOW DOWN during construction. Consider using Pearl St. as a detour.